Entries by Lee Stout

The Drawing Was Right. The ERP Was Wrong.

Operational Reality: The Drawing Was Right. The ERP Was Wrong. I’ve seen this one play out more than once. A component engineer gets word that an AMP connector is being superseded. The right people are notified. Electrical Engineering does exactly what they’re supposed to do. They find a replacement. Update the mating connector. Update the […]